Electrical tests are mainly categorized as Routine, Type and Special Tests. We
may see the |
| "Design
Test" in some standard specification which is covered by above mentioned
classification. |
|
ANSI/IEEE, CSA and IEC are most commonly used standards in testing transformers. |
| |
| |
|
| DC Resistance of Windings |
|
| |
Using Kelvine/Thomson Bridge |
| |
Volt Ampere Method |
| |
Using Digital ohm/micro ohm meters |
| |
Choosing the value of measuring current |
| |
Evaluating the results |
| Voltage (Turn) ratio, Vector
Group and Polarity Check |
|
| |
TTR using two Voltmeters |
| |
Polarity using DC current/using Voltmeters |
| |
TTR & check of Polarity using TTR Bridge |
| |
TTR on One phase Transformers |
| |
TTR on Three phase Transformers |
| |
TTR on Auto-Transformers |
| |
TTR on Transformers with special internal connection |
| |
Evaluating the results/Localizing failure |
| No-load loss and No-Load current |
|
| |
Supply Voltage problem |
| |
What is Form fctor? |
| |
Hysteresis and Eddy Losses and their relation |
| |
Measurements on Single Phase transformers |
| |
Measurements on three phase Transformers |
| |
Measurements on Traction Transformers |
| |
QA hints on Iron Core (Repaired Transformers) |
| |
How to Measure? |
| |
Special Test Circuit connections |
| |
Evaluating the results |
| |
Applying meters, CT and PT correction factors |
| Load-Loss and Impedance Voltage |
|
| |
What is Short-Circuit Voltage |
| |
Short circuit voltage related to the load current |
| |
Short circuit voltage related to windings temperature |
| |
Short circuit impedance |
| |
Short circuit voltage related to Frequency |
| |
What is Load-loss |
| |
Load-loss related to load current |
| |
Role of Windings resistance in measurement |
| |
Load-loss related to windings temperature |
| |
Load-loss related to Frequency |
| |
Load-loss without knowing resistance values |
| |
How to measure? |
| |
Special comments on measuring circuit |
| |
Special Test Circuit connections |
| |
Measurements on Single phase Transformers |
| |
Measurements on three phase Transformers |
| |
Evaluating the results |
| |
Applying meters, CT and PT correction factors |
| |
How precise is your Measurement? |
| Applied Potential Test |
|
| |
Measurement basics |
| |
Voltage Supply |
| |
Test transformer |
| |
High voltage set up |
| |
Role of damping resistor |
| |
Voltage measurement on primary side |
| |
How to perform the test? |
| |
Preparation |
| |
Compensation set up |
| |
Test duration and test Frequency |
| |
Evaluating the results |
| |
How precise is your Measurement? |
| Induced Over-Voltage Test |
|
| |
Basics and fundamentals of test circuit |
| |
Voltage supply |
| |
Inductive compensation |
| |
Intermediate transformer |
| |
Set up for Voltage and Frequency measurement |
| |
Voltage dividers and their effect on test circuit |
| |
Voltage measurement by using sphere gap |
| |
How to manage the test? |
| |
How to switch to the test object? |
| |
How to set up the compensation? |
| |
Duration of the test |
| |
Evaluating the results |
| |
How precise is your Measurement? |
| Partial Discharge Measurement |
|
| |
Measurements basics and test circuit based on IEC 270 |
| |
Measurement set up |
| |
High pass filters |
| |
Coupling Capacitors and related connections |
| |
Quadri poles and their connections |
| |
Measuring instruments |
| |
Calibration process |
| |
Oscillograms and some other helpful hints |
| |
PD levels in Test-Field (Back ground) |
| |
Preparing measuring and test circuit |
| |
Voltage measurement |
| |
Inception and Exception voltage |
| |
Trend of PD measurement |
| |
Evaluating the test |
| |
Probable reasons for higher PDs on transformers |
| |
How precise is your Measurement? |
| RIV Test |

To Be Continued |
| Heat Run Test (Temperature Rise
Test) |

To Be Continued |
| Lightning ans Switching Impulse
Test |

To Be Continued |
| Zero Sequence Measurements |

To Be Continued |
| Noise Level Measurement |

To Be Continued |
| Measurement of Harmonics in
No-Load current |

To Be Continued |
| |
|
| |
|